Ridge/Barge Cap unventilated hip detail
1. Fit 50 x 25mm batten, fixed to tile battens, along length of hip.
2. Cut tiles to a raking angle and turn Decra Oberon tiles up 25mm against batten.
3. Fit Ridge/Barge Cap over upstand and nail with one Decra Fixing Nail on each side of the Ridge Cap near the end lap.
NOTE: The Ridge/Barge caps have a slight taper in their design. Place the wider end of the ridge over the narrower end of the ridge beneath (overlap areas shown shaded grey).
Let Decra offer you expert advice and information at every stage of your project.For technical advice and assistance.01293 545058Or for local advice technical advice and support
Useful downloads
CAD Library Decra's CAD & drawing library Installation GuidesInstallation Guides & Decra Literature Decra LiteratureBrochures and certificationVideo (System Performence)Video demonstrations showing the Decra roof systems outstanding performanceVideo (Detailing Guide)Video Installation guide, demonstrating how Decra roofs can be correctly detailed