Decra Oberon Unventilated Ridges


Decra Oberon - Ridge using Ridge/Barge Cap - Detail from drawing DPTE020
 

  

Installation Guidance - Decra Oberon

 

 

Ridge/Barge Caps Ridge (Unventilated)
Fit two tile battens either side of ridge. Fix additional 50mm x 38mm batten to suit Ridge/Barge cap on top of rear of the two tile battens.

Lay top course of tiles with back turned up 38mm against the top tile batten.

 
Tips on cutting and bending tiles
 

 


 

Ridge/Barge Caps Nailing & Lapping
The Ridge/Barge caps have a slight taper in their design. Place the wider end of the ridge over the narrower end of the ridge beneath (overlap areas shown shaded grey).

Each Ridge/Barge cap should be secured with 2 nails on each side of the ridge cap through the pre-drilled holes

 

 

Ridge/Barge Cap Ends
 
1. Snip and fold out flap to suit intersection of Ridge/Barge caps with gable mounted Ridge/Barge caps.

2. Slot end cap into position behind the flaps of the Ridge/Barge caps and fix into position with pop rivets or small zinc plated self tapping screws and cover with Decra finishing kit.

3. Install Ridge/Barge caps and nail into position.

4. Nail lower edge of end cap

 

 

 


 

 

 

 

 