|
Ridge Course D Ridge (Unventilated)
Fit two tile battens either side of ridge. Fit two tile battens either side of ridge.
Cut top tiles to suit (leaving a 10mm gap between the top cut edge of the tile and the top cut edge of the tile on the other side of the ridgeline).
Fix additional 50mm x 25mm batten to suit D Ridge on top of the tiles, taking care to sandwich the D Ridge Sealing Strip between the batten and the tile. Tips on cutting and bending tiles
|