Installation Guidance-Decra Classic,Elegance and Parctile
Ridge Course D RidgeThe correct way to install the top course of tiles and the ridge tiles is dictated by whether you are trying to achieve an unventilated or ventilated ridge detail.
NOTE: Be aware there is more than one type of ridge ventilation system.
D ridge vent filler
Universal ridge ventilator
Ridge Course D Ridge With D Ridge Vent Filler D ridge vent filler
Cut underlay short of ridge line and fit two tile battens either side of ridge, leaving a sufficient gap for ventilation.Lay top course of tiles with back turned up 38mm. Using a D Ridge as a guide, fit 50mm x 25mm battens and ridge vent filler units either side of ridge and fix through high point of tiles at laps and two in between the laps (see fixing instructions with ventilation pack). Tips on cutting and bending tiles
Ridge Course D Ridge With Universal D Ridge Vent
Cut underlay short of ridge line and fit two tile battens either side of ridge, leaving a sufficient gap for ventilation.Fix additional tile batten to suit ridge on top of rear of the two tile battens.Lay top course of tiles with back turned up 38mm against top tile batten. Place ridge cap into position over the top batten and the upstand edge of tile. Pull bottom edge of ridge cap away from the upstand edge of tiles and slip Universal 'D' ridge/hip ventilators into position on each side of the 'D' ridge cap. Ventilators should run continuously along each side of the ridge cap.The ridge cap and ventilator to be nailed through the downturn of the ridge cap into the face of the batten, using four Decra fixing nails on each side.Tips on cutting and bending tiles
Ridge Course Nailing & Lapping D RidgesThe ridge caps have a slight taper in their design. Place the wider end of the ridge over the narrower end of the ridge beneath creating an 80mm overlap.Each ridge should be secured with 4 nails on each side of the ridge cap.
NOTE: Where roof pitches exceed 35° it may be necessaryto adjust the return angle of the downturned leg of the‘D’ Ridge Cap.
D Ridge Ends Caps 1. Snip and fold out flap to suit choice of verge/barge cover.2. Trim edge of flap to create a vertical plumbline when fitted.3. Install D Ridges over end of D Ridge End Cap ensuring good tight lap occurs. Then nail D Ridge End Cap into position (Fix vertical end of D Ridge End Cap first).
Let Decra offer you expert advice and information at every stage of your project.For technical advice and assistance.01293 545058Or for local advice technical advice and support
Useful downloads
CAD Library Decra's CAD & drawing library Installation GuidesInstallation Guides & Decra Literature Decra LiteratureBrochures and certificationVideo (System Performence)Video demonstrations showing the Decra roof systems outstanding performanceVideo (Detailing Guide)Video Installation guide, demonstrating how Decra roofs can be correctly detailed