|
Ridge/Barge Caps Ridge (Ventilated)
Cut underlay short of ridge line and fit two tiles battens either side of ridge, leaving a sufficient gap for ventilation.
Fix additional tile batten to suit ridge on top of rear of the two tile battens.
Lay top course of tiles with back turned up 38mm against top tile batten.
Place Ridge/Barge cap into position over the top batten and the upstand edge of tile. Pull bottom edge of ridge cap away from the upstand edge of tiles and slip Universal 'D' ridge/hip ventilators into position on each side of the Ridge/Barge cap. Ventilators should run continuously along each side of the ridge cap.
The ridge cap and ventilator to be nailed through the predrilled holes in the downturn of the ridge cap into the face of the batten, using two Decra fixing nails on each side of the Ridge/Barge cap.
Tips on cutting and bending tiles
|