|
1. Install 50 x 38mm vertical battens, fixed
to tile battens at both faces of the corner.
2. Bend tiles to form 25–38mm upstand
against vertical battens.
3. Position Ridge/Barge Cap over vertical
battens and tile upstand.
4. Fix with one Decra Nail each side of the
Ridge/Barge Cap near the end lap.
|